Project Dashboard
Project Document Library
Specifications, design drawings and approved preliminary documents with controlled access.
Approved Mix Designs
Central mix-design codes used directly in Concrete Summary.
Concrete Control
Daily pours, cube schedules, additional test ages and test-report tracking.
Current User Access
Daily Shift Report
The V8/V7 DSR workflow remains: weather first → activities → subcontractor manpower → photos with captions → review → PDF.
IRF Management
For this V9 prototype, the main focus is the professional UI and the new document library, mix-design database, concrete test schedule and user signature governance.
Approved Project Documents
Add Controlled Document
ITP Register
RFA integration can be added in the next phase so an approved RFA automatically creates/updates the relevant ITP register entry.
Approved Concrete Mix Designs
Concrete Summary
Add Concrete Pour
Concrete Test Reports
Rebar Summary
Rebar delivery, diameter, heat/batch, supplier, testing requirement and linked report tracking remain available from V8 and can be expanded next.
Rebar Test Reports
Rebar laboratory reports will be linked to the corresponding heat/batch records in the same way concrete reports are linked to concrete pours.